Hi, and thank's for a great product!
I have a little problem when trying to sync the calendar between the outlook plugin and sugarcrm 4.2.1:
If I add a full day event in outlook the duration time turns out to be "0" in sugarcrm and doesn't show up in the calendar. Is this a bug or am I doing something wrong? The duration should be 24h, right?
//Henrik